Monday 26 January 2015

Wood floor sanding and lacquering in Newmarket Ellesmere Center


To preserve the wood as best as possible we fully re-sand and finish the floors using Pallmann products in Newmarket Ellesmere Center.

By choosing a Pallmann applicator /contractor you are automatically covered by the Product Support Pallmann offers to their trained applicators. This covers our clients and ourselves against the product failing. As an Ultimate Floor sanding Affiliate we also offer a 2 year guarantee with all the floor sanding work we carry out.


The process for wood sanding and lacquering in Mewmarket was as follow:

1. PREPARATION OF THE FLOOR BEFORE SANDING
We will inspect the floor to ensure all nails are well below the wood surface. All loose board will be secured before sanding commence.

2. HIGH-FILTRATION VACUUM
Removal of dry soil and particles that might cause damage to the floor during the sanding process.

3. SANDING OF THE MAIN FLOOR AREA
The system we use is 99.9% dust free as we use an advanced extraction system. Different grit values on the bell sander will ensure a quality finish.

4. EDGES AND DETAILED SANDING
Our edging sander delivers a uniform finished to all edges and hard to reach places under fixes furniture and radiators.

5. RESIN FILLING OF GAPS BETWEEN BOARDS AND BLOCKS
We will use a strong and semi flexible resin and mix this with fine dust from your floor. This mix will be used to fill smaller gaps between the boards and blocks in the floor. By doing this the life of the floor is extended as no water ingress is then possible. If the gaps are open between the boards – every time you wash your wood floor some cleaning water gets into the wood. If its filled this is not possible

6. FINAL FINISHING: ROTARY SANDING
A super fine grit sanding system will deliver a superior and even finish to the whole floor area. This is done by means of a rotary sander.

6. FINE DUST REMOVAL
Highly efficient vacuum system is used for the thorough removal of any dust particles from the freshly sanded wooden floor.

7. LACQUERED FINISH:
Application of a Primer to the sanded floor followed by one coat of water based lacquer We always prefer to use Pallmann Products as they are far superior to others.
Once the first coat has cured, the floor will be prepared for a further 2 coats of lacquer. Be aware that if will take up to 8 hours* for the floor to cure enough to allow light foot traffic. Furniture can only move back 24 hours*  after foot traffic has commenced. (Avoid at all cost dragging furniture on a  freshly lacquered floor surface.).

* Curing and drying time depends on weather conditions and air flow

Our clients find great benefit in our dustless sanding system and we are sure you will see the benefits too.



Art of Clean is a specialist cleaning firm in: 






Working for domestic or commercial clients throughout Cambridgeshire, Essex, Suffolk and Hertfordshire.

For more information on our services contact our friendly team on 01223 863632 or email us at info@artofclean.co.uk